Testing Pressure-Reducing Valves

01/24/2014
BY BILL GUSTIN Every morning at shift change, firefighters throughout North America perform daily apparatus checks and routine maintenance on their equipment. A vital portion of an apparatus check involves operating the pump so that you can depend on it to get water. Generally, this involves engaging the pump, operating the primer, and fully opening every intake and discharge valve while their caps are in place. This "exercises" the valves and facilitates a check of discharge gauges. This is followed by closing the discharge valves and relieving the pressure by operating their respective bleeder valves. Valves are occasionally lubricated to ensure that they will operate easily. ...

To access this articles and others like, join the Fire Engineering Training Network today.

  Gain unlimited access to the most comprehensive database of firefighter training info in the world.

  Membership in the Fire Engineering Training Network includes:

  • Exclusive Online Access to FireEngineering.com News & Articles
  • Fire Engineering Magazine Historical Archives (Online-Only)
  • Annual Print Subscription to Fire Engineering Magazine
  • Annual Digital Subscription to Fire Engineering Magazine

Join Now

 Already a member? Scroll down to the Login form below to access this article.

LOGIN TODAY

FE Logo

Log into Fire Engineering and you'll have total access to the industry's leading online resource for finest training simulations, articles, instructional videos and much more.