WATER WORKS OF WARREN, ME.

WATER WORKS OF WARREN, ME.

Warren, Me., is to be supplied with water for fire, domestic, and other purposes. A charter looking towards this end was granted K. F. Wight, of that place, by the last State legislature. The water supply will be derived from a pasture on a high hill opposite Mr. Wight’s residence, where are several springs flowing an abundant supply of water of very fine quality. The daily flow by pump measurement is 186,000 gallons, which can be increased, if necessary. The reservoir, on which work has been begun, has an elevation sufficient to give a fall of 186 feet, and with a pressureol ninety-six pounds to the square inch through an eight-inch pipe. It will have granite pointed walls; will be fifteen feet deep; will hold 2 000,000 gallons of water, and will be supplied by the spring.An artesian well will be sunk,to be used in case of emergencies. A trench will be constructed round the reservoir to carry away the surface water. The main will be laid from the reservoir to the road, and then the town will be given an opportunity to vote for a water system contract. If it refuses so to vote,then the pipes will be laid throughout the town and connections made with houses for domestic use. It is not considered likely that there will be any refusal. The system, as at present contemplated, will cost $11,000. The construction of the plant is under the supervision of C. E. Shute. It is intended’to lay the pipes to the State prison, to supply which it seems likely a contract will be made.

No posts to display