THE ROOF PACK

THE ROOF PACK

Picture the following scenario. A truck company arrives on a second alarm at a two-story, wood-frame attached row house with a flat roof. Fire has control of the second floor. The incident commander orders the roof cut.
10 min read
CHEMDAL CORPORATION

CHEMDAL CORPORATION

Color brochure outlines features of Fire-GelTM, a polymer designed to work with water to enhance fire suppression, limit fire spread, and prevent rekindle. Describes FireGel`s…
1 min read
Chief PETER LAMB of the Lisbon (ME) Fire Department

Chief PETER LAMB of the Lisbon (ME) Fire Department

won the 1998 Executive Fire Officer Scholarship, which is awarded by the International Association of Fire Chiefs Volunteer Chief Officers Section. The scholarship enables volunteer…
1 min read
HOSE DRYING SYSTEM

HOSE DRYING SYSTEM

GearGrid Systems: Simultaneously dries up to 200 feet of 212-inch and 350 feet of 134-inch hose (separated in 50-foot lengths). System constructed of steel tubing…
1 min read
MORE TWO-MINUTE DRILLS

MORE TWO-MINUTE DRILLS

As mentioned numerous times in Fire Engineering, proper size-up of a fire operation begins with the receipt of the alarm and continues until the operation…
6 min read
BILLY D. HAYES

BILLY D. HAYES

is the new state fire safety educator for the Georgia Insurance and Safety Commissioner`s Office. Previously, he served with the Morrow Fire De-partment in metropolitan…
1 min read
NAVISTAR INTERNATIONAL TRANSPORTATION CORPORATION broke ground on a new stamping and cab assembly

NAVISTAR INTERNATIONAL TRANSPORTATION CORPORATION broke ground on a new stamping and cab assembly

NAVISTAR INTERNATIONAL TRANSPORTATION CORPORATION broke ground on a new stamping and cab assembly building in Springfield, Ohio. The 273,000-square-foot facility will press, weld, and fabricate…
1 min read